Medford Conservation Commission Approves MWRA Valve Project With Amended Planting Conditions

MEDFORD — October 7, 2020 — Medford Conservation Commission approves MWRA valve project and MBTA vegetation plan at remote October meeting. The commission voted 4-0 to issue an order of conditions for the Massachusetts Water Resources Authority's low-service pressure-reducing valve replacement at the Condon Shell parking lot, within the 200-foot Mystic River riverfront area, adding conditions requiring the substitution of Rhus glabra sumac for loam-and-seed plantings in the compensatory storage island and extending tree-protection barriers to the drip line where feasible — a net gain of 93 cubic feet of flood storage. One member recused for a conflict; a second abstained for missing the prior hearing. The commission then voted unanimously to issue a negative determination of applicability for the MBTA's 2021-2025 integrated vegetation management plan along the commuter rail right of way, finding the work will not alter protected wetland resource areas and does not require a Notice of Intent — with final approval of the broader plan by the Massachusetts Department of Agricultural Resources expected before December 31, 2020.

Keep reading with a 14-day free trial

Subscribe to The Medford MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Medford MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Melrose Post · The Natick Post · The Newton Post · The North Reading Post · The Pepperell Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.