Medford Conservation Commission unanimously approves three DCR environmental permits

MEDFORD — July 21, 2021 — Medford Conservation Commission clears three DCR projects in unanimous remote session. The board voted 4-0 on each of three items July 21, issuing a negative wetlands determination for like-for-like tennis court resurfacing at Dugger Park, an Order of Conditions for a fitness area renovation at Flynn Rink near Quarter Mile Pond (MassDEP file 215-0225), and an Order of Conditions for a connecting pathway from the Route 28 bridge's new Shared Streets and Spaces bike lanes to the Mystic River multi-use path system (file 215-0226). Sandra Libby, planner and project manager with DCR, told commissioners the Flynn Rink redesign produces a net reduction of 730 square feet of impervious surface through a porous poured-in-place rubber fitness pad. Commissioners attached two conditions to the Flynn Rink permit: no herbicide use in removing invasive bittersweet, and all invasive material to be hauled off site.

Keep reading with a 14-day free trial

Subscribe to The Medford MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Medford MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Melrose Post · The Natick Post · The Newton Post · The North Reading Post · The Pepperell Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.